Meetings are generally held on Monday evenings at 5pm. Please call in advance to confirm dates and times.
Home > Committees > Road Advisory Committee
A. The RAC will develop and recommend to the BOS specific: planning; bidding; contracting; reporting methods to better ensure proper and efficient management of road activities, and accountability of resources. These methods will include, but not be limited to: annual, seasonal, monthly, weekly, daily road work schedules; reports of hours worked and specific work performed; vehicle and equipment documents to track daily, routine vehicle and equipment use; vehicle and equipment maintenance schedules; emergency procedures. Procedures will be reviewed at least once per year and findings will be submitted at least once per year, in writing, no later than September 30th, to the BOS along with any recommended changes and the reasons why.
B. The RAC will, as needed, review, develop and recommend, in writing, to the BOS no later than April 1st of each year: road work design; repair and maintenance standards and any changes. State of New Hampshire Department of Transportation road construction standards, and experience the previous year may serve as guides.
C. The RAC will comment to the BOS on work bidding and contracting. When bids are returned to the Town Office by interested contractors, the BOS will ask the RAC to review the bids and provide the BOS, in writing, the positives and negatives of each option and contractor under consideration.
D. When requested by the BOS, the RAC will comment, in writing, on proposed purchases.
E. The RAC will review completed roadwork and comment to the BOS on the execution of the design and contract specifications, and if costs were kept within the contract and the annual budget. Any comments and or recommendations will be presented to the BOS in writing as the recommendation/comment of the RAC, not as individuals.
F. Neither the RAC, nor individual members will directly supervise the Epsom Road Department (ERD) in the performance of daily roads activities, nor attempt to direct the manner in which work is being performed, nor have any official, direct contact with contractors during the performance of their duties.
G. The RAC will consult with the BOS about the content and updating accuracy of files on town roads as requested.
H. The RAC will work with the RA to submit to the BOS no later than September 30th of each year a written roads budget recommendation for the following fiscal year, to include specific justification.
I. The RAC and the RA will present to the BOS, in writing, no later than September 30th their specific plan and schedule for the following year's road maintenance and upgrades throughout the Town, as well as a revised 5 year plan.
| Gary Kitson |
| Don Weaver |
| Rita Graham |
| (Road Agent) |
| Peter Bosiak (BOS Rep) |